11.06.2025 |  Project Photos Glenholm Balancing the timeless character of Glen Iris and with the needs of a modern family, these are residences full of light, warmth and space, ready for you to make a new home and grow a new... See More
11.04.2022 |  Project Photos Alfreda Modern design and timeless craftsmanship come together in perfect harmony. This beautifully crafted Alfreda townhouse represents the ultimate progression of luxury living. Nestled in a highly... See More
12.01.2022 |  Project Photos Carrington Hill Carrington Hill redefines contemporary urban living in the sought-after suburb of Box Hill in Melbourne’s east. Inspired exterior design celebrates sleek lines and contemporary forms within... See More
12.01.2022 |  Project Photos 1975 Step into a 1975 residence, and there is an immediate sense of depth and dimension. High ceilings, abundant sunlight, and a range of textural finishes create a layered sense of beauty. These are... See More
29.09.2021 |  Project Photos Gardenia Park – Boronia The architecture of Gardenia Park is inspired by the surrounding green character of Boronia, from the terraces and windows offering views of the neighbouring parks, to the use of subtle colours... See More
11.06.2025 |  Construction Updates Mercer, May 2025 Floor structure in first structure complete First floor wall framing in progress Windows ordered; preparing for installation Please see below the photos taken from the... See More
11.06.2025 |  Construction Updates Audrey, May 2025 Water meters installed Units 6-10 roof installation in progress Units 1-5 first floor framing in progress Please see below the photos taken from the... See More
11.06.2025 |  Construction Updates Prime, May 2025 External cladding complete Roof installation complete Gutters installed, downpipes in progress Wall insulation complete Internal plastering commenced Please see below the photos taken from the... See More
29.04.2025 |  Construction Updates Mercer, Apr 2025 Basement hydraulic and mechanical services in progress Basement stud framing in place Ground floor framing complete Floor structure of first floor in progress for rear units Please see below... See More
29.04.2025 |  Construction Updates Audrey, Apr 2025 Units 6-10 ground floor framing complete Units 6-10 first floor framing and party walls in progress Basement hydraulic and mechanical services in progress Basement ceiling insulation... See More
29.04.2025 |  Construction Updates Prime, Apr 2025 All window installation complete Staircase installation complete Second floor lightweight wall cladding complete Base coat render for ground floor Hebel walls complete Electrical rough-ins near... See More
31.03.2025 |  Construction Updates Mercer, Mar 2025 Basement ceiling insulation has been installed. Ground floor plumbing rough-ins are now in place. Ground floor steel and timber framing are nearing completion. Ground floor party walls have been... See More