11.04.2022 |  Project Photos Alfreda Modern design and timeless craftsmanship come together in perfect harmony. This beautifully crafted Alfreda townhouse represents the ultimate progression of luxury living. Nestled in a highly... See More
12.01.2022 |  Project Photos Carrington Hill Carrington Hill redefines contemporary urban living in the sought-after suburb of Box Hill in Melbourne’s east. Inspired exterior design celebrates sleek lines and contemporary forms within... See More
12.01.2022 |  Project Photos 1975 Step into a 1975 residence, and there is an immediate sense of depth and dimension. High ceilings, abundant sunlight, and a range of textural finishes create a layered sense of beauty. These are... See More
29.09.2021 |  Project Photos Gardenia Park – Boronia The architecture of Gardenia Park is inspired by the surrounding green character of Boronia, from the terraces and windows offering views of the neighbouring parks, to the use of subtle colours... See More
29.04.2025 |  Construction Updates Mercer, Apr 2025 Basement hydraulic and mechanical services in progress Basement stud framing in place Ground floor framing complete Floor structure of first floor in progress for rear units Please see below... See More
29.04.2025 |  Construction Updates Audrey, Apr 2025 Units 6-10 ground floor framing complete Units 6-10 first floor framing and party walls in progress Basement hydraulic and mechanical services in progress Basement ceiling insulation... See More
29.04.2025 |  Construction Updates Prime, Apr 2025 All window installation complete Staircase installation complete Second floor lightweight wall cladding complete Base coat render for ground floor Hebel walls complete Electrical rough-ins near... See More
31.03.2025 |  Construction Updates Mercer, Mar 2025 Basement ceiling insulation has been installed. Ground floor plumbing rough-ins are now in place. Ground floor steel and timber framing are nearing completion. Ground floor party walls have been... See More
31.03.2025 |  Construction Updates Audrey, Mar 2025 Steel structural members have been installed. Ground floor blockwork walls are currently in progress. Fire services equipment has been delivered. Timber frame materials have arrived... See More
31.03.2025 |  Construction Updates Prime, Mar 2025 Ground floor bricklaying is complete. Ground floor window installation is complete. Ground floor Hebel panel walls are currently in progress. Scaffolding installation is complete, allowing... See More
03.03.2025 |  Construction Updates Mercer, Feb 2025 Entire ground floor concrete slab pour – Complete Ground floor wall framing for Units 6-8 – Complete Ground floor wall framing for remaining units – In progress Please see below the photos... See More
03.03.2025 |  Construction Updates Audrey, Feb 2025 Entire ground floor concrete slab pour – Complete Ground floor wall framing for Units 6-8 – Complete Ground floor wall framing for remaining units – In progress Please see below the photos... See More