16.09.2026 |  Project Photos Audrey Set within Auburn Village, Audrey is an expression of contemporary sophistication from a collaboration between Ascui & Co and MEMLA. Innovative by design yet timeless in appeal, these curated... See More
10.09.2026 |  Project Photos Prime Prime is a considered collection of townhomes built for contemporary Prahran living. Beyond the statement façade and generous interiors, it's the philosophy behind the design that sets Prime... See More
11.06.2025 |  Project Photos Glenholm Balancing the timeless character of Glen Iris and with the needs of a modern family, these are residences full of light, warmth and space, ready for you to make a new home and grow a new... See More
11.04.2022 |  Project Photos Alfreda Modern design and timeless craftsmanship come together in perfect harmony. This beautifully crafted Alfreda townhouse represents the ultimate progression of luxury living. Nestled in a highly... See More
12.01.2022 |  Project Photos Carrington Hill Carrington Hill redefines contemporary urban living in the sought-after suburb of Box Hill in Melbourne’s east. Inspired exterior design celebrates sleek lines and contemporary forms within... See More
12.01.2022 |  Project Photos 1975 Step into a 1975 residence, and there is an immediate sense of depth and dimension. High ceilings, abundant sunlight, and a range of textural finishes create a layered sense of beauty. These are... See More
29.09.2021 |  Project Photos Gardenia Park – Boronia The architecture of Gardenia Park is inspired by the surrounding green character of Boronia, from the terraces and windows offering views of the neighbouring parks, to the use of subtle colours... See More
18.12.2024 |  Construction Updates GlenHolm, Dec 2024 Builder’s cleaning is still in progress. Final touch-ups by the painter and renderer are ongoing. Landscaping has been completed, adding the finishing touches to the outdoor areas. The authority... See More
30.11.2024 |  Construction Updates Prime, Nov 2024 Footings and columns along the driveway are complete. Steelwork assembly is currently in progress. Ground floor framing is complete for Units 4–6 and underway for Units 1–3. External... See More
30.11.2024 |  Construction Updates Mercer, Nov 2024 Basement columns have been completed. Basement blockwork walls are nearing completion. The car turntable installation is finalised. Formwork for the ground floor concrete slab is currently being... See More
30.11.2024 |  Construction Updates GlenHolm, Nov 2024 Stone installations are now complete. All timber and carpet flooring has been installed, with the builder’s clean set to begin shortly. Air conditioning installation is finalised. Final touch-ups... See More
04.11.2024 |  Construction Updates Audrey, Nov 2024 Bored piers are complete. Capping beams have been successfully installed. Retaining walls are now finished. Inground plumbing works are well underway. Bulk excavation for the basement is in... See More
31.10.2024 |  Construction Updates Mercer, Oct 2024 Steel reinforcement for basement blockwork walls is in place Reinforcement for concrete columns is in place Concrete footings are complete Capping beams are complete Construction of concrete... See More
30.10.2024 |  Construction Updates GlenHolm, Oct 2024 Concrete driveway has been completed, and landscaping is underway. Stone installations for the kitchen and vanity are complete, with plumbing fit-off in progress. All joinery work is complete,... See More
20.10.2024 |  Construction Updates Prime Construction Commencement Site cut and survey complete Drainage works in progress, in-ground stormwater plumbing installed Excavation for underground water tanks in progress NBN conduits is complete Preparation of... See More