11.04.2022 |  Project Photos Alfreda Modern design and timeless craftsmanship come together in perfect harmony. This beautifully crafted Alfreda townhouse represents the ultimate progression of luxury living. Nestled in a highly... See More
12.01.2022 |  Project Photos Carrington Hill Carrington Hill redefines contemporary urban living in the sought-after suburb of Box Hill in Melbourne’s east. Inspired exterior design celebrates sleek lines and contemporary forms within... See More
12.01.2022 |  Project Photos 1975 Step into a 1975 residence, and there is an immediate sense of depth and dimension. High ceilings, abundant sunlight, and a range of textural finishes create a layered sense of beauty. These are... See More
29.09.2021 |  Project Photos Gardenia Park – Boronia The architecture of Gardenia Park is inspired by the surrounding green character of Boronia, from the terraces and windows offering views of the neighbouring parks, to the use of subtle colours... See More
29.01.2025 |  Construction Updates Prime, Jan 2025 Wall framing complete Roof trusses in progress Plumbing stack work underway Please see below the photos taken from the... See More
29.01.2025 |  Construction Updates Mercer, Jan 2025 Basement blockwork walls complete Formwork for the front section of the ground floor slab in place, ready for concrete pour Wall framing in the process of prefabrication Please see below the... See More
29.01.2025 |  Construction Updates Audrey, Jan 2025 Basement retaining walls complete Basement columns complete Basement blockwork walls underway Water tanks and pump installation underway Please see below the photos taken from the... See More
19.12.2024 |  Construction Updates Mercer, Dec 2024 The rear section of the ground floor slab has been successfully poured. Reinforcing steel and formwork are now in place for the remainder of the ground floor slab. Basement blockwork walls are... See More
18.12.2024 |  Construction Updates GlenHolm, Dec 2024 Builder’s cleaning is still in progress. Final touch-ups by the painter and renderer are ongoing. Landscaping has been completed, adding the finishing touches to the outdoor areas. The authority... See More
30.11.2024 |  Construction Updates Prime, Nov 2024 Footings and columns along the driveway are complete. Steelwork assembly is currently in progress. Ground floor framing is complete for Units 4–6 and underway for Units 1–3. External... See More
30.11.2024 |  Construction Updates Mercer, Nov 2024 Basement columns have been completed. Basement blockwork walls are nearing completion. The car turntable installation is finalised. Formwork for the ground floor concrete slab is currently being... See More
30.11.2024 |  Construction Updates GlenHolm, Nov 2024 Stone installations are now complete. All timber and carpet flooring has been installed, with the builder’s clean set to begin shortly. Air conditioning installation is finalised. Final touch-ups... See More