11.04.2022 |  Project Photos Alfreda Modern design and timeless craftsmanship come together in perfect harmony. This beautifully crafted Alfreda townhouse represents the ultimate progression of luxury living. Nestled in a highly... See More
12.01.2022 |  Project Photos Carrington Hill Carrington Hill redefines contemporary urban living in the sought-after suburb of Box Hill in Melbourne’s east. Inspired exterior design celebrates sleek lines and contemporary forms within... See More
12.01.2022 |  Project Photos 1975 Step into a 1975 residence, and there is an immediate sense of depth and dimension. High ceilings, abundant sunlight, and a range of textural finishes create a layered sense of beauty. These are... See More
29.09.2021 |  Project Photos Gardenia Park – Boronia The architecture of Gardenia Park is inspired by the surrounding green character of Boronia, from the terraces and windows offering views of the neighbouring parks, to the use of subtle colours... See More
04.11.2024 |  Construction Updates Audrey, Nov 2024 Bored piers are complete. Capping beams have been successfully installed. Retaining walls are now finished. Inground plumbing works are well underway. Bulk excavation for the basement is in... See More
30.10.2024 |  Construction Updates GlenHolm, Oct 2024 Concrete driveway has been completed, and landscaping is underway. Stone installations for the kitchen and vanity are complete, with plumbing fit-off in progress. All joinery work is complete,... See More
20.10.2024 |  Construction Updates Prime Construction Commencement Site cut and survey complete Drainage works in progress, in-ground stormwater plumbing installed Excavation for underground water tanks in progress NBN conduits is complete Preparation of... See More
30.09.2024 |  Construction Updates GlenHolm, Sep 2024 Landscaping has commenced. Exterior bricklaying is currently in progress. Concreting is set to begin within the next week. Tiling is completed for TH01-TH07, with tiling in progress for... See More
30.08.2024 |  Construction Updates GlenHolm, Aug 2024 All underground services are complete. All staircases are installed. Bathroom waterproofing is complete, and tiling is in progress. Internal fixing is underway. Exterior rendering is still in... See More
31.07.2024 |  Construction Updates GlenHolm, Jul 2024 Underground service installation in progress. Exterior rendering in progress, affected by heavy rainfall over the last few weeks. Staircase installation in progress. All plasterboards have been... See More
30.06.2024 |  Construction Updates GlenHolm, Jun 2024 Rough-in Completion: All rough-in work has been completed, ensuring essential infrastructure is in place. Exterior Cladding: The installation of exterior cladding along the central driveway... See More
31.05.2024 |  Construction Updates GlenHolm, May 2024 Timber cladding panels have been installed, enhancing the exterior aesthetics. Hebel panels and fibre cement sheets are being installed, with rendering underway. Electrical and air-conditioning... See More